Planning
A site material tracking system that keeps every requisition inside the plan
StruconIQ is a site material tracking system that starts with the quantities you priced. Each project has a material plan listing the planned quantity for every material line, from cement and ballast to steel and roofing sheets. Against each line you see what has been requisitioned, ordered on an LPO, delivered and accepted, and the balance still left to requisition.
Available on Starter, Growth and Enterprise · see pricing
The problem
What goes wrong without it
On many Kenyan sites the bill of quantities stays in the QS's file while materials are ordered by phone. Cement runs out, more is bought, and nobody checks it against the quantity that was priced. At the end of the job the project has used far more than planned, and nobody can say where the difference went.
How StruconIQ handles it
One plan per project
Set up a material plan for each project, with one line per material and its planned quantity. Materials are grouped into categories you control, such as cement and binders, steel, timber, plumbing or electrical, so reports can show spend by category later. Our team loads your materials for you during setup.
Every line tells you where it stands
For each material line, StruconIQ shows four figures side by side:
- Requisitioned: the quantity asked for in requisitions
- Ordered: the quantity on requisitions that already have an LPO
- Delivered: the quantity on accepted delivery receipts
- Balance: what is still left to requisition
A supervisor can see at a glance how much ballast is left in the plan before raising another request, and the QS can see whether deliveries are keeping pace with orders.
Requisitions cannot exceed the plan
A material requisition is raised against a plan line, and it cannot ask for more than the balance left. That one rule stops most quiet over-ordering, because extra material needs a deliberate change to the plan rather than a phone call to a hardware shop.
Running low, before you run out
When less than 10% of a line is left to requisition and it has not all been delivered, the line is marked running low. It is the cue to check whether the remaining work really fits the remaining quantity, or whether the plan needs to change.
Plan changes are approved
Designs change and quantities move. To change a plan line, a user raises an adjustment request with the new quantity. Someone with approval rights approves it, rejects it, or sends it back for clarification. The plan only changes once it is approved, so it always reflects decisions the office has made.
Planning that pays off later
Because every requisition, LPO and delivery is tied to a plan line, the same figures feed site deliveries and the material category totals in budget vs actual reports. For a practical guide, read how to stop material wastage and theft on site. Material planning matters most to building contractors and to project management and QS firms that must account to a client for every bag and tonne.
Key capabilities
What you can do with Material planning
-
Planned quantity per line
One material plan per project, grouped by category.
-
Four figures per line
Requisitioned, ordered, delivered and balance left.
-
Capped by the plan
Requisitions cannot ask for more than the balance.
-
Running low marker
Shown when under 10% is left to requisition.
-
Approved plan changes
Adjustments are approved, rejected or sent back.
-
Materials loaded for you
Our team sets up your materials during setup.
Related features
Works well with
-
RequisitionsMaterial requisitions
StruconIQ is a material requisition system for construction sites. A supervisor raises a requisition for one line on the project's material plan, the office approves it, rejects it or asks for an amendment, and the request moves on to an LPO, delivery, verification and payment. At every step you know who asked, who approved and what it will cost.
-
DeliveriesSite deliveries
StruconIQ records construction site deliveries against the requisition they belong to. The site logs each receipt with the supplier's delivery note attached, as a PDF or a photo, plus extra photos taken on the phone camera. Partial deliveries, extra quantity and disputes each have their own step, so you only pay for material that actually arrived and was accepted.
-
ProcurementLPOs & procurement
StruconIQ is construction procurement software for Kenya that turns an approved requisition into a Local Purchase Order for a registered supplier, produced as a printable PDF on your own letterhead. There is one LPO per requisition, with the material, quantity and supplier taken from the approved request, so the supplier is asked for exactly what the office approved.
Who uses material planning
Free demo
See material planning on a site like yours
A short walkthrough of a project budget, a requisition, a delivery and a casual roll-call, on a call or at your office. Book online, call or WhatsApp us and we will set a time that suits you.